Policy: Design load includes safety margin. UPS size selected from standard kVA list (1, 1.5, 2, 3, 5, 7.5, 10, ... 120).
Runtime estimated using battery specs and efficiency.
UPS Sizing Results
Actual Load (W)
Design Load (W)
Required UPS Size
Redundancy Type
Total UPS Units
Total System Capacity
Estimated Runtime
Battery Energy (Wh)
System Complements (Recommended)
Automatic Bypass & Static Switch
SNMP/Web Monitoring Card
Battery Temperature Compensation
External Maintenance Bypass
Load Bank Testing (pre-commissioning)
Harmonic Filtering (if non-linear loads)
Generator Compatibility Interface
This tool is a design aid only. Final UPS system design must be verified with IEEE/NFPA standards, manufacturer data, and site-specific conditions.
Always include 20–30% future expansion margin. Battery runtime decreases with age, temperature, and cycling.
Feedback Integrated Solutions
UPS Sizing – Summary Report
Project:—
Owner:—
Address:—
Connected Load (W):—
Design Load (W):—
Required Runtime:—
Recommended UPS Size:—
Redundancy Type:—
Total UPS Units:—
Total System Capacity:—
Estimated Runtime:—
Battery Voltage / Capacity:—
System Complements
Signatures
Prepared by: ____________________
Reviewed by: ____________________
Approved by: ____________________
Notes
—
This summary is a design aid. Final design must be verified against IEEE/NFPA standards and manufacturer specifications.
Always consider future expansion, ambient temperature, and battery aging in runtime calculations.