Preliminary Estimate Only: Planning aid. Verify with TIA/EIA‑568 & ISO/IEC 11801 limits, BS EN 50174 installation practices, IEC 60364 separation, and TIA‑606 labeling before execution.
Feedback Integrated Solutions
Unified Data/Network — Preliminary Summary Report
Project:—
Owner:—
Address:—
BoQ (Preliminary)
Item
Quantity
Reference
Notes
RJ45 Outlets (Total)
—
TIA/EIA‑568 & ISO/IEC 11801
Includes future & spares
Wi‑Fi AP
—
Planner
PoE per class
IP Phones
—
—
PoE per class
IP Cameras
—
—
PoE per class
Attendance
—
—
Admin/Industrial
Patch Panel Ports
—
TIA‑606
—
Patch Panels
—
—
—
Switch Ports
—
—
With capacity buffer
Switches (ports/budget)
—
—
—
PoE Power Budget
Device
Count
Class
W/Device
Total W
Wi‑Fi AP
—
—
—
—
IP Phones
—
—
—
—
IP Cameras
—
—
—
—
Attendance
—
—
—
—
Total
—
—
—
—
Cabling Summary
Cable Group
Base (m)
Buffer (%)
Total (m)
Notes
Horizontal Copper
—
—
—
≤90 m permanent link
Patch Cords
—
—
—
WA + TR ≤10 m
Vertical Riser
—
—
—
Per floor
Grand Total (Copper)
—
—
—
Includes buffer
Backbone Fiber
TR Count
Fiber Type
Pairs/TR
Redundancy
Total Pairs
—
—
—
—
—
Preliminary Estimate Only: Final design must be verified against TIA/EIA‑568 & ISO/IEC 11801, BS EN 50174, IEC 60364 and TIA‑606 and approved by the AHJ before implementation.